Advice6 min read
Doors for Christmas? In stock yes, made to order no
Doors before Christmas: the last day to order in-stock sets, when made-to-order doors arrive and how to prepare the opening and the fitting.
This text was machine-translated from Slovak and is awaiting review by a native speaker.
Doors from this article
We are here to help
Don’t know the opening size?Measuring guide →Already decided?Door configurator →Would you rather call? 0907 085 086 or info@idvere.sk.
Quick answer: when to order
In-stock doors:
- Order by 12 December. The last delivery of in-stock doors to the shop before the holidays is on 16 December. After that we deliver them or you collect them at the shop in Prešov. We confirm the exact delivery day when you order.
- After 12 December only on request. Everyone wants their doors at once before Christmas, so we first confirm whether we can still make it. Call or write to the shop.
- Outside the holidays the usual time applies: delivery within 7–10 working days*.
We do not guarantee made-to-order doors for Christmas. The count starts from the working day after the order and excludes Saturdays, Sundays and public holidays:
| Order placed on | Made to order: dispatch earliest – latest* |
|---|---|
| 16 Nov | 8 Jan – 29 Jan 2027 |
| 23 Nov | 15 Jan – 5 Feb 2027 |
| 30 Nov | 22 Jan – 12 Feb 2027 |
| 7 Dec | 29 Jan – 19 Feb 2027 |
| 14 Dec | 5 Feb – 26 Feb 2027 |
Even for an order on 16 November the earliest dispatch is only in early January (8 January).
Note: the date is indicative, see the note about delivery times. The exact delivery day is set by the delivery day of your region and we confirm it when you order. The time for made-to-order doors already includes transport from the manufacturer to the shop (5 to 7 working days) and a week of reserve.
How we count working days
A working day is Monday to Friday except public holidays. In December and January these are 24, 25 and 26 December, 1 and 6 January. The shop is closed on those days. We count with the same rule the website uses for delivery times. The dates in the table are fixed for 2026, so if you read this later, treat them as an example of the calculation.
What is in stock and where to see it
13 sets are in stock, in a limited choice of finishes and standard widths of 60 to 90 cm. Each set has a leaf, a frame and a lock. The full list of models and finishes is in the catalogue with the In stock filter. The delivery time is shown with every model. Three in-stock sets for orientation:
- In stock25 decors
Erkado · FréziaFrézia 1in photo dub stset from€350within 7–10 working days*
- In stock24 decors
Invado · Linea ForteLinea Forte 5in photo dub európskyset from€240within 7–10 working days*
- In stock4 decors
Porta · Porta CPLPorta CPL 1.1in photo biela štruktúraset from€280within 7–10 working days*
The comparison of in-stock and made-to-order doors (finishes, frames, standards) is in the article Doors in stock or made to order. If the in-stock finish does not suit you, choose made-to-order doors and forget about Christmas. You will live with the doors for years.
Why made-to-measure takes 7 to 10 weeks
Made-to-order doors are not produced in advance. The manufacturer makes them only after your order, in your finish, width, hand, standard and with the frame size for your wall. The time already includes transport from the manufacturer to the shop (5 to 7 working days; goods usually reach us on Wednesday or Thursday) and a week of reserve. Each manufacturer has its own time, so it differs by model (7 to 10 weeks). We have no data about other production steps, so we do not invent any: the manufacturer provides the time and we show it as a range. For you it means one thing: production 7–10 weeks*.
* The delivery date is approximate. In case of unforeseen circumstances (e.g. a delay at the manufacturer or the carrier) we reserve the right to reasonably postpone it; we will let you know in advance.Why made-to-order doors are not returnable
They are made to your requirements, so they normally cannot be returned. This matters most for the hand and the frame size. Check them before ordering, ideally with a second person. The differences between in stock and made to order are explained in the article Doors in stock or made to order.
What to prepare before delivery
Delays are most often caused not by the manufacturer but by a wrong dimension or an unprepared opening. Go through this list before ordering.
- Measure the opening. The width in three places, the height in two and the wall thickness in three places including plaster and tiles. For the thickness the greatest value counts. Step-by-step instructions are in the article How to measure a door opening and the measuring guide works out the frame size for you.
- Measure the finished wall. If plaster and tiles are not done yet, enter the planned thickness including adhesive. A tiler sometimes uses more adhesive than you expect.
- Height from the finished floor. If the floor is not laid, find out its thickness with adhesive or underlay.
- Hand. Determine it using the article Left-hand or right-hand doors.
- Architrave and opening. If the opening is wide, check whether the architrave covers it (frame architrave).
- Space to unpack. The leaves are about two metres high. Prepare a place where they can lie flat.
- Who fits them and when. Book a fitter in advance, before the doors are at home. Give them the frame size and wall thickness straight away.
- Access for delivery. Say whether there is a lift or stairs at the address and how to carry the doors into the flat.
Order of work
Doors are fitted only after finishing work on the walls. The manufacturer states this in its installation conditions. A practical order looks like this:
| Step | Why in this order |
|---|---|
| 1. Rough construction, plaster, tiles | They set the final wall thickness, which determines the frame |
| 2. Floor | It sets the final opening height |
| 3. Measuring the finished openings | You measure the final wall and floor |
| 4. Ordering the doors | Made-to-order doors can no longer be returned |
| 5. Fitting the frame and leaf | After finishing work on the walls |
| 6. Handles and trims | Last, so they are not damaged during the work |
The exact order of frames and floor depends on the type of frame and floor. A fitter will advise you, so invite them to look at the site before ordering.
If the doors will not make it for Christmas
They will not if you order made-to-order doors, or if it is already after 12 December and we cannot confirm in-stock doors for you. Nothing is lost. What to do:
- Order now, not in January. The time is counted from the order. An order in November means doors in January to February, an order in January means doors in March.
- Plan the fitting after the holidays. Book a fitter for January or February, when the doors will be at home.
- Keep the old doors until the new ones arrive. Nobody wants an opening without a door over the holidays.
- Split the flat. If you need doors in only one room, take an in-stock set for it and order the rest made to measure. The finishes may differ, so think it over. The guide puts doors together room by room into one basket.
Frequently asked questions
Can I still order doors in December and have them for Christmas?
In-stock sets, yes, if you order by 12 December. The last delivery to the shop before the holidays arrives on 16 December. After 12 December only on request, because everyone wants their doors at the same time before Christmas. We do not guarantee made-to-order doors for Christmas.
What if I measure wrongly?
Made-to-order doors are produced to your dimensions and are normally not returnable, so measure the opening only after the wall and floor are finished. For in-stock doors we handle an exchange by agreement, preferably in the unopened packaging and at the customer’s cost. You can send us a photo of the opening with a tape measure before ordering and we will check it.
Do you deliver over the holidays?
On public holidays (24, 25 and 26 December, 1 and 6 January) the shop is closed and those days do not count towards the delivery time. We will confirm at the time of the order whether and how deliveries run between the holidays. Plan for delivery before Christmas Eve.
I will not make it for Christmas with made-to-order doors. Is it worth ordering now?
If you plan the fitting after the holidays, yes. Made-to-order doors: production 7–10 weeks*. An order in mid-November means doors after New Year (January to February), an order in December means doors from late January to February. The earlier you order, the earlier the doors arrive.* The delivery date is approximate. In case of unforeseen circumstances (e.g. a delay at the manufacturer or the carrier) we reserve the right to reasonably postpone it; we will let you know in advance.
Prices and availability are from the current price list, updated 16 November 2026.